Category: Politics

  • A need for high-speed rail reality (Updated)

    IMG_6258-001VIA Rail train at Brampton Station, on the Toronto-Kitchener rail corridor

    Updated Friday May 19, 2017:

    Today, Premier Kathleen Wynne announced the commencement of an Environmental Assessment on bringing high-speed rail to Southwestern Ontario, connecting Toronto and Pearson Airport with Guelph, Kitchener, and London, with Phase II continuing to Windsor, with a potential stop in Chatham.

    Former federal Transport Minister David Collenette was assigned to write a report on building the corridor; it is now public on the Ministry of Transportation’s website. It proposes operating speeds up to 250 km/h, making it a true high speed line (though slower than many lines in Europe and East Asia, which have cruising speeds between 270 and 320 km/h). The estimated cost of the project is estimated to be $21-billion, reducing travel times from Toronto to Windsor to a mere two hours.

    figure-es-2-proposed-future-southwestern-ontario-passenger-rail-network.jpgProposed High Speed Rail system for Southwestern Ontario

    An option for a 300 km/h HSR service was studied, but found to be even more expensive, requiring more dedicated tracks. The 250 km/h option will allow it to use most of the existing Toronto-London and London-Windsor corridors.

    For southwestern Ontario, high speed rail could be a boon. Kitchener-Waterloo is a major educational and technological hub; faster and more frequent rail service will benefit university students, tech workers, and other commuters, perhaps those priced out of the Toronto housing market. London’s economy has taken some hits in recent years, so bringing it within commuting distance to Toronto and K-W gives residents there more options.

    Between Toronto and Kitchener, the report assumes two off-peak HSR trains an hour, and one GO train every hour, making local stops. It also assumes that GO RER service will continue to terminate at Bramalea, a poor location to terminate regional rail services; Downtown Brampton is one stop away. Building the “missing link” along Highway 407 will allow many more trains to pass through Downtown Brampton, which would allow for local RER trains to be extended to west Brampton, at Mount Pleasant GO. It would be a shame if the HSR plans (which, in principle, I support) pushed aside regional and local needs.

    Statford and St. Marys, which are only served by VIA trains (and no intercity coach service) will also have to be considered, as they will be bypassed by HSR. As well, towns and cities elsewhere in southwest Ontario, such as Simcoe, Tillsonburg, Wallaceburg, and St. Thomas, have no bus or rail access. For less than the $15 million pledged for the HSR EA, the province could fund several years’ worth of basic intercity bus service to connect these communities together.

    Unless assumptions change, Brampton residents will see twice as many trains speed by their downtown core than stop, which I think is unfortunate. In the original post below, I was worried that high speed rail dreams would distract from more immediate needs. I’m now afraid that I was right.


    Original post dated April 26, 2017

    When have I heard this one before?

    According to CTV News, the provincial government is looking to build a new high-speed rail line between Toronto, Kitchener, and London. The new plan, to be announced next month, is based on the work of former federal Transport Minister David Collenette.

    During his time as Transport Minister under Prime Minister Jean Chretien, Collenette backed incremental VIA Rail improvements, as well as VIA-FAST, a higher-speed train service between Toronto, Ottawa, and Montreal. Those proposed improvements were cancelled when Paul Martin became prime minister; currently VIA is pushing for a revised version of that previous plan. Collenette also pushed hard for a rail link between Toronto Pearson International Airport and Union Station, a fundamentally flawed proposal known as “Blue 22.” That airport rail link proposal was later relaunched as a provincial project and opened as UP Express in 2015.

    Ontario Transportation Minister Steven Del Duca was not especially clear about the plans for such as high-speed rail service, saying “…there are multiple definitions for high-speed rail depending on what you’re looking at.” Del Duca cited “geographical limitations,” while hoping that the federal government would contribute funds towards the project.

    Interestingly, only a week ago, Deputy Minister Deb Matthews (and London MPP) was downplaying the province’s plans, saying the province only promised to study, but not necessarily build, the high-speed rail corridor.

    I worry that high-speed rail is a distraction. In Canada, we have an abysmal record of proposing high-speed rail projects, but never following through. Even VIA’s less ambitious plan for dedicated tracks and new equipment to provide more frequent and reliable service, with somewhat faster travel times, is not yet secure.

    There is already a Toronto-Kitchener-London service; two VIA trains operate daily in each direction along the entire route, while GO Transit operates more frequent weekday trains to Brampton and four weekday round trips to Kitchener. Before the 1990 Brian Mulroney-era VIA cuts, there were five round trips on this line. In the 1980s, the fastest VIA train between Toronto, Kitchener, and London took 3 hours, 2 minutes; today, the fastest train is 3 hours, 22 minutes.

    This Rick Mercer Report video will never get old

    All that I want for the Toronto-Kitchener-London corridor in the short-to-medium term is the same as what VIA is proposing between Toronto and Montreal:

    • Dedicated tracks. On the Toronto-Kitchener-London corridor, this means building a new rail corridor, known as “The Missing Link” for freight trains between Halwest (near Bramalea GO Station) and Milton. This new route would divert Canadian National (CN) freight trains that currently pass through Brampton and Georgetown on the Toronto-Chicago mainline. Potentially, Canadian Pacific (CP) trains passing through Toronto and Mississauga could also be diverted, freeing up capacity on GO Transit’s Milton Line. CN freight traffic limits the frequency and speed of GO Transit rail service to Brampton and Kitchener; moving the through freight trains would allow for frequent, electrified, GO RER service beyond Bramalea, as currently proposed. CN is interested in partnering with the province to build this link; CP has not expressed interest.Ibi Missing Link map.jpg
      Map of the “Missing Link” from a 2015 IBI Group report
    • Rail improvements. Between Georgetown and Kitchener, the railway is owned by Metrolinx, and hosts four weekday GO Transit trains in each direction, two daily VIA trains in each direction, and several Goderich-Exeter Railway (GEXR) freight trains. Track is in good shape, but has several slow sections, including a two-kilometre section west of Guelph Central Station where trains crawl at 10 miles an hour (16 km/h).

      Improving rail speeds in central Guelph will be expensive, especially where the railway runs in the middle of residential Kent Street, but it will be worth it.
      Beyond Kitchener, the track is leased and maintained by GEXR, which has allowed the rails to deteriorate. Slow speeds are acceptable by a no-frills short line freight operator, determined to minimize maintenance costs, but not so for passenger rail. VIA trains are consistently late because of the condition of track, especially between Stratford and London. Purchasing the track, installing welded rail, and improving grade crossings will substantially improve reliability and speeds on this corridor.Incremental improvements, such as grade separations, improved signalling, and new passing tracks, would permit frequent, reliable, and faster rail service.
    • A new train fleet. Via Rail’s coaches are nearing the end of their useful lives; among the rolling stock used on the Toronto-Kitchener-London service are HEP-I and HEP-II coaches built in the 1950s and refurbished several times since. GO Transit’s commuter coaches are acceptable for shorter trips, but are uncomfortable for long-distance travel. With the completion of the “Missing Link” and the acquisition of the Kitchener-London rails, it would be possible to electrify the entire corridor. Electric trains benefit from faster acceleration times, especially electric multiple units.

    Some of these improvements can be started within the next year, before the 2018 provincial election. If the province wants to show that it’s serious about providing effective rail service to Kitchener and London, there’s no need for another high-speed rail study. Simply continue the work on the “Missing Link,” plan for GO RER to continue west of Bramalea GO, improve the existing rail infrastructure, and acquire the optimal fleet for medium-distance rail services. Once that is complete, planning for even higher speeds, possibly with a new purpose-built alignment, should begin.

    Canadians have been teased with high-speed rail proposals that never get anywhere, meanwhile existing rail infrastructure is neglected and intercity services are cut. It’s time to get moving with a sensible plan that can start right now.

  • A new low for the Scarborough Subway champion

    Note: a version of this article has been cross-posted to Spacing Toronto

    For 2016’s annual Torontoist Heroes and Villains feature, I nominated Toronto Councillor Glenn De Baeremaeker (Ward 38, Scarborough Centre) as villain of the year. (“Pedestrian blaming” won that dubious honour.) But I remain proud of my choice. As I wrote back in December:

    De Baeremaeker’s record of environmentalism has been overshadowed by an increasingly antagonistic tone, pitting supposedly downtrodden Scarborough against the rest of the city in his one-track quest to build a one-stop subway extension to his ward. In his myopic support of the subway, De Baeremaeker is opportunistic and vindictive, takes the low road, insults critics who engage in good faith debates, and in the process does a disservice to the community he represents.

    Councillor De Baeremaeker hasn’t changed his tone.

    Yesterday, May 10, the City of Toronto held a public consultation at Scarborough Civic Centre on the next phase of planning for that one-stop, 6.2-kilometre subway extension, which is estimated to cost $3.35 billion, and open no earlier than 2026.

    I wish I was able to attend last night’s meeting, as disgruntled Scarborough residents questioned the merits of that transit plan. And Councillor De Baeremaeker shamelessly blamed “downtown councillors” for the shortcomings of that one-stop subway. For a councillor who is rightly proud of his past environmental advocacy, it was surely a low point.

    Toronto Star reporter Jennifer Pagliaro, an excellent local journalist, covered the meeting. 

    City Scarborough MapCity of Toronto map from February 2016 illustrating current plans for the Scarborough Subway and connecting transit.

    At the public consultation, TTC and City planning staff answered queries from members of the public, many questioning the utility of the single-stop subway. There are no additional funds to rough in future stations, such as at McCowan Road and Lawrence Avenue, where the line would intersect the busy 54 Lawrence East bus and serve Scarborough General Hospital. As building future stations later would require an extended shut-down of the line, the one-stop subway extension will likely be forever a one-stop subway.

    (The eastern extension of the Eglinton-Crosstown LRT from Kennedy Station to University of Toronto’s Scarborough Campus is also part of the new plan for Scarborough, but the LRT component is unfunded.)

    Shameless as ever, Councillor De Baeremaeker resorted to strawman arguments, talking up a “suburban/urban divide”:

    [De Baeremaeker] blamed “downtown councillors,” who represent the most densely populated wards in the city, for not wanting to fund more frequent transit stops like their residents enjoy.

    Yes, it is true that all councillors representing central Toronto opposed the subway extension, but so did several suburban politicians, most notably Councillor Paul Ainslie (Ward 43 – Scarborough East). Yet not one of those councillors wanted less transit for Scarborough. Instead, they backed a seven-stop LRT replacement for the ageing Scarborough rapid transit line, including an extension to Centennial College and Sheppard Avenue in Malvern. That less-expensive line was fully funded by the provincial government, which would have permitted scarce funds to be spent on other transit projects across Toronto.

    Meanwhile Mayor John Tory was most interested in pushing SmartTrack, a fantasy rail project that got pared down as parts of the line were found to be impossible to build, and costs increased. The eastern end of SmartTrack conflicted with the Scarborough Subway extension. The three-stop subway plan was cut to a single stop at Scarborough Centre, to keep costs down and to not cannibalize SmartTrack.

    Yet Tory and De Baeremaeker are allies on the subway extension; Tory named him one of his Deputy Mayors to champion the line. But Tory’s push for his own project put him at odds with De Baeremaeker’s focus on the subway extension, any subway extension, to his ward.

    It is also worth noting that until 2012, De Baeremaeker supported Transit City, the transit plan championed by David Miller that would have delivered three new light rail lines to Scarborough.

    I am not surprised by De Baeremaeker’s shameless politics. But his performance last night was especially crass and dishonest. Backed into a corner, faced with angry local residents, he lashed out at imaginary villains. But subway backers largely have themselves to blame; despite winning every recent vote on the subway plan, they have only one stop to show for it.

  • Leadership, John Tory style (part 2)

    We’ve seen it before: when cornered on an issue, Mayor John Tory will get defensive, flustered, and counter with disingenuous remarks. Police carding was one such issue, so was the Gardiner East. Today, as Mayor Tory defends his SmartTrack proposal, he’s doing the same thing.

    After a staff report on SmartTrack — originally planned for a week ago at the scheduled Executive Committee — became public, we learned more details about the watered-down transit plan that was Tory’s signature campaign promise. (Read Steve Munro’s article in Torontoist for more details.)

    • In 2014, John Tory promised that his “London Style” surface rail subway would open in just seven years. Now, we find out that it won’t be completed until 2025-2026.
    • Only six new stations will be added to GO Transit’s existing stops on the Kitchener and Stouffville corridors; the GO RER system planned by Metrolinx will stop at the same stations as SmartTrack, blurring the lines further between the province’s plans and Tory’s promises.
    • The City of Toronto will be on the hook for all LRT operating expenses, while the Province/ Metrolinx will continue to own the infrastructure.
    • The City of Toronto would be on the hook for some of the GO RER expenses, such as 15 percent of required grade separations, such as at Steeles and Finch Avenues in Scarborough.
    • The Eglinton-Crosstown LRT west extension to Pearson International Airport, which replaced part of the original SmartTrack alignment planned using outdated Google Maps satellite imagery, may not be built beyond the planned Renforth Gateway Hub, the eastern end of the Mississauga Transitway.
    • Tax Increment Financing (TIF) will not be enough to fund the construction of SmartTrack and the LRT extension; development charges and a property tax hike would be required to fund SmartTrack’s construction.

    smarttrack_fbThe original SmartTrack plan that John Tory campaigned on in 2014

    These are serious concerns, and it is worth asking whether Toronto should remain committed to this plan. After all, the Relief Line Subway remains unfunded, even though it is a top priority for city planning staff. And there’s that $3.2 billion one-stop subway extension to Scarborough Centre, which might become even more expensive if so-called “Subway Champions” Councillor Glenn De Baeremaeker and Liberal MPP Brad Duguid get their way with a proposed realignment.

    (Interestingly, a SmartTrack/RER stop at Lawrence East may not be able to be built before the one-stop subway extension is opened — a Scarborough RT station is in the way. This isn’t good news for transit riders on the 54 Lawrence East bus, which will lack a rapid transit connection in Scarborough.)

    Mayor John Tory’s response is to ask “what’s their plan?” instead of listening and responding to critics. It’s certainly not a productive or mature reaction to very valid concerns.

    There were several alternative plans made by rival candidates in 2014 — Olivia Chow and David Soknacki backed returning to the cheaper and longer Scarborough LRT replacement, and building the Downtown Relief Line subway. Chow also proposed additional bus services, which was mocked by Tory’s campaign as no real plan for transit. Once Tory was elected, the TTC ended up implementing much of Chow’s bus plan, including restoring most of Rob Ford-mandated service cuts and adding new express and night routes.

    Last week, John Tory also rejected — yet again — the new ward boundaries recommended by the Ward Boundary Review Team, independent consultants who came up –twice — with a 47-ward solution meant to reflect population growth (especially downtown and in central North York) and imbalances in ward populations and councillors’ workloads. The Executive Committee voted against the mayor, backing the 47-ward option, but staff warn it might be too late now for the 2018 election. That might suit Tory’s political agenda, but it’s a blow against local democracy.

    Bottom line: Olivia Chow has no plan for transit. She is not a leader.
    – John Tory, 2014

    So no, John Tory, you’re not a leader. You have failed to acknowledge your errors, you haven’t listened to critics, you’re stubborn, and you lash out when things don’t go your way. And you won’t listen to experts because you don’t like what they have to say. At one point, you claim your critics don’t have any alternative plans to SmartTrack, at other times, you mock the very plans that critics suggest.

    So far, John Tory’s critics have been correct about his transit plan. Maybe it’s time to listen.

  • Mapping Mayor Tory’s support on Council

    Matt Elliott, columnist for Metro Toronto, is one of Toronto’s greatest observers of local politics. One great service that he does is keep track of all important votes at Toronto City Hall. Originally, this work tracked each councillors’ support for Mayor Rob Ford from 2010 through 2014; now his scorecard tracks how each councillor voted according to Mayor John Tory’s agenda. The Council Scorecard spreadsheet is available here.

    In 2014, I created several maps using Elliott’s data that helped to show how Rob Ford lost control of City Council. In Ford’s first year, he was able to count on the support of 22 councillors, enough to get most of his agenda passed. But by 2014, only two councillors – Giorgio Mammoliti (Ward 7) and Rob’s brother, Doug (Ward 2) voted with the mayor at least 70 percent of the time.

    I felt it was about time to map how well Mayor Tory is doing.

    torys-team-score-2015
    Team Tory Score, as of December 2015

    In his first year as mayor, from December 2014 to December 2015, Tory enjoyed the support of over half of Toronto City Council; 24 of 44 councillors voted with the mayor at least 70 percent of the time. Important votes on budget austerity, council appointments (such as Police Board Chair and Tory friend, Andy Pringle), approving the “Hybrid” option for the Gardiner Expressway, and approving Uber’s operations in Toronto were all passed.

    But there were some surprises. Many key Tory supporters voted against the mayor on a motion introduced by Councillor Justin Di Ciano (Ward 5) to ask the province not to support ranked ballots. The mayor, who supported the electoral reform, lost that vote.

    In that first year, most other councillors provided some support, voting with the mayor at least 30 percent of the time, including former mayor Rob Ford (Ward 2). The wards that these councillors represent are marked in orange. Generally, these wards are represented by centrist or left-leaning councillors such as Josh Matlow (Ward 22), Maria Augimeri (Ward 9) and Shelley Carroll (Ward 33).

    Only two councillors — Mike Layton (Ward 19) and Joe Cressy (Ward 20) voted opposite to Mayor Tory over 70 percent of the time in 2015.

    torys-team-score-to-june-2016
    Team Tory Score, as of July 2016. Votes from the October 2016 Council Meeting not yet included. 

    So far in 2016, the divide between the allies of the mayor and his opposition widened. Only ten councillors were left in the middle (all centre-left), while five councillors — Gord Perks (Ward 14), Kristyn Wong-Tam (Ward 27), Paula Fletcher (Ward 30), Janet Davis (Ward 31), and Anthony Perruzza (Ward 8) joining the opposition. With the exception of Ward 2, vacated after Rob Ford’s death, all councillors from Etobicoke and Scarborough became clear Tory allies.

    It’s worth noting few normally centrist councillors, who were very effective in opposing Rob Ford’s agenda last term, are now staunch allies, including Paul Ainslie (Ward 43), and Bailão (Ward 18). Both are members of Tory’s Executive Committee; Ainslie, a centre-right councillor who has earned my great respect, was also appointed chair of the Government Management Committee.

    Opposition to Tory’s agenda from councillors in the Toronto-East York region might help to explain why the Executive Committee, hand-picked by Tory and his transition team, did not have much enthusiasm for the 47-ward solution recommended by consultants on the Toronto Ward Boundary Review team. To reflect population growth, Downtown Toronto would get three new councillors in 2018, as would central North York. One ward would disappear in Toronto’s west end; incumbent councillors Ana Bailão (Ward 18) and Cesar Palacio (Ward 17), both Tory allies, are the most affected by that change. In May, the committee requested that the consultants go back to the drawing board and look at a new 44-ward option, as well as ward boundary options consistent with provincial and federal ridings. The consultants did that, and are once again recommending the 47-ward option.

    Almost half-way through his term, Mayor Tory has a confident and strong hold on Council, which has so far supported an agenda of austerity, along with major (and in my view, unwise) transportation infrastructure projects like the Scarborough Subway and the Gardiner East reconstruction.

    It is worth noting as well that apart from Bailão, all councillors from “downtown” wards were frozen out of Tory’s inner circle, even though many downtown and midtown wards enthusiastically voted for Tory in the 2014 election. Furthermore, most of the same councillors that support Tory at least 70 percent of the time also supported Ford’s agenda in 2011 and 2012. Key supporters of Ford’s early agenda went on to sit on John Tory’s Executive Committee.

    While there’s a slightly conservative bent to Toronto City Council, left-leaning mayor David Miller was able to work with centrists and conservatives, including suburban councillors, to implement his agenda, appointing several to key boards and committees. Tory, on the other hand, has frozen out council’s progressives, perpetuating an urban-suburban divide.

    ford-nation-percentage-2011-crop
    Mayor Rob Ford’s allies and foes in 2011

    It’s possible that Tory’s hold on power will slip as councillors get restless, or if there’s a backlash to cuts to city services such as the TTC or the Toronto Public Library. After all, Rob Ford’s hold on power slipped long before the crack scandal as residents fought back against budget cuts, and council quashed the Ford Brothers’ attempt to build a Ferris wheel and mall in the Portlands.

    The mid point between municipal elections is coming up, and there’s an opportunity to make changes to committee and board appointments. There’s still an opportunity for new alliances to be made and for goals to change to support a growing city and address growing economic disparity.

  • The subway is coming. Let’s improve Scarborough Centre

    As the readers of my blog probably know, I am not a fan of the Scarborough Subway extension. Even though the subway will be expensive and less useful than a fully-funded light rail replacement of the ageing Scarborough RT, politicians from all three major parties have backed the subway, promising “respect” and “fairness” for Scarborough.

    Neethan Shan, the New Democratic Party’s candidate in Thursday’s provincial by-election in Scarborough-Rouge River, has been pushing this messaging hard, though all three candidates — including City Councillor Raymond Cho, running for the Progressive Conservatives — are all in favour of the extension. That conveniently ignores the fact that the subway won’t even stop in Scarborough-Rouge River — though the LRT would have.

    But it’s now time to move on. Scarborough is going to get a six kilometre long, one-stop subway extension, which was confirmed by a vote at city council in July. The focus should now be on getting the best value out of the $3.2 billion project. That must include improving Scarborough Centre.

    The subway extension is currently in the environmental assessment/detailed design stage. I expect that construction will actually begin probably just before the next provincial election is called in 2018. It won’t open for another four to five years after that, in 2022 or 2023. That is plenty of time to make some necessary changes to the street grid, the built form, and the public realm.

    A few weeks ago (during a rare summer rain storm), I explored Scarborough Centre. With too many surface parking lots and a hostile road network, there’s a lot of work that has to be done to make the improve this suburban hub. Employment and residential growth is currently stagnant; that has to be addressed. All that said, there are also a lot of great community assets already in place, and there are some opportunities to make it better.

    (more…)

  • Mapping the Ward 2 by-election

    Ward 2 By-election
    Poll results of the 2016 council race in Ward 2

    On Monday, July 25, residents of Ward 2 (Etobicoke North) went to the polls to elect a new councillor to replace the late Rob Ford, who was elected as councillor in the 2014 general election after a disastrous four years as mayor.

    After Rob Ford’s death in March 2016, it was widely expected that the Ford family would field a candidate; it would either be former Ward 2 councillor Doug Ford or Rob and Doug’s nephew Michael Ford (née Stirpe).

    Michael Ford, then 20 years old, ran for councillor in the 2014 general election. He withdrew in September 2014 to run for the local Toronto District School Board trustee position, so that Rob Ford could run for councillor instead, abandoning his bid for re-election as Mayor of Toronto due to his poor health. Doug Ford, who originally wasn’t going to run again for municipal office, ran for mayor in Rob’s place, coming in a strong second to John Tory. I mapped those results in a previous post. 

    Right away, Michael Ford was the clear favourite to win the by-election. The Ford name is famous in north Etobicoke; Doug Ford Senior was a Progressive Conservative MPP from 1995 to 1999; Rob Ford represented Ward 2 from 2000 through 2010 before running for mayor, and winning against George Smitherman. But Michael Ford, only 22, claimed to be his own person; his brief tenure on the TDSB board has been without the buffoonery or intolerance that Rob and Doug exhibited; Michael attended the 2016 Pride Parade in 2016, something the other Fords made a point of avoiding. But Michael Ford campaigned on a platform of “customer service” — the same philosophy that made Rob Ford popular in his ward.

    There were eleven candidates running against Michael Ford. They included:

    • Entrepreneur Justin Canning, a right-of-centre candidate who made a point of saying that Michael isn’t like Rob and Doug Ford when quoted in the Toronto Star;
    • Christopher Strain, a New Democrat who managed Russ Ford’s campaign for councillor in Ward 6 in the 2014 election;
    • Chloe-Marie Brown, a volunteer and City Hall intern who sought to represent her community and bring attention to the needs of lower income residents of North Etobicoke.

    Voter turnout was low, as they often are for municipal by-elections. Only 9391 residents voted in 2016, less than half the 19,793 votes for councillor that were cast in 2014. And to no one’s surprise, Michael Ford won, with 70.0%of the vote. Justin Canning came in a very distant second, with 20.4%, Chris Strain had only 3.8% of the vote, Chloe-Marie Brown only got 1.6%.

    Michael Ford came in first place in all by two polls by wide margins, as shown in the map above. Only two polls, 020 and 024, chose Justin Canning. Poll 020 represents two condo towers on Islington Avenue at Dixon Road, while Poll 024 represents a seniors’ residence on Lawrence Avenue. Both polls voted for Rob Ford for council in 2014, but for John Tory for mayor over Doug Ford.

    Even though I am willing to give Michael Ford a chance to prove himself as city councillor (and we will see how different he truly is from his uncles), the low voter turnout and the inevitability of Ford’s win still troubles me. Perhaps the low turnout was partly due to the assumption that Ford would win this by-election; holding it in the middle of summer wouldn’t have helped either. But there was a solid choice of alternative, qualified candidates that deserved voters’ consideration. Ward 2 deserved a real contest, not another coronation.

  • That video

    With the charges against Sandro Lisi dropped, the publication ban on his case — including evidence presented at pre-trial court proceedings — was lifted. If you recall, Lisi was a friend and the driver for former mayor Rob Ford. Lisi was charged with alleged extortion, trying to get a infamous — yet almost completely unseen — video captured on a cellphone that showed Ford smoking crack and spewing obscenities at the Basso residence in Etobicoke.

    That video — the subject of an explosive story published in May 2013 by the Toronto Star and Gawker — was finally made public. You can watch it, if you like, on the Star’s website. But I’m not suggesting that you should.

    Yes, I watched it, but I almost wish I didn’t. I ended up feeling nothing but sadness. Sad for Rob Ford’s immediate family, and sad for Rob Ford. I can not stop thinking about all the people Ford hurt over the years, including himself. That sadness then turned to anger and contempt when I started to think about Ford’s enablers. And there were plenty of them.

  • Toronto’s new rapid transit plan

    Yesterday, City Council decided, by a vote of 27-16, to go ahead with the $3.1 billion one-stop extension of the Bloor-Danforth Subway to Scarborough Centre, rejecting Councillor Josh Matlow’s last-ditch attempt to resurrect the LRT replacement and extension of the ageing Scarborough LRT line. Council — Mayor Tory included — also voted to spend resources studying three more suburban subway extensions and a re-alignment of the proposed Relief Line subway backed by the local councillor.

    Unfortunately, the chance of going back to the less-expensive, yet longer seven-stop light rail line is slim-to-nil at this point. In my view, it’s time for transit advocates that backed the LRT to focus their energies elsewhere. Like Metrolinx’s fare integration strategy, and the plans for other LRT lines, such as the eastern and western extensions of the Eglinton-Crosstown.

    TT - Scarborough VoteHow council voted on Councillor Matlow’s motion to resurrect the LRT option for Scarborough

    In order to ensure that he had enough votes, John Tory entertained Ward 39 Councillor Jim Karygiannis’ motion for a study on an extension of the Sheppard Line from Don Mills Station to Scarborough Centre. (There’s a LRT proposed for Sheppard East, but no matter.) Karygiannis’ motion passed, as well as several other councillors’ pet subway projects. Ward 10 Councillor James Pasternak has long pushed for a Sheppard Subway extension west between Sheppard-Yonge and Downsview Stations, and he successfully got that included as well. Finally, Justin Di Ciano (Ward 5) got a study approved for a subway extension in his ward as well, resurrecting a long-dormant proposal for a subway extension from Kipling Station to Sherway Gardens.

    It’s worth noting that all three right-leaning councillors are reliable votes for John Tory.

    Downtown, Paula Fletcher (Ward 30) moved that staff re-examine the Relief Line, moving the recommended alignment from under Pape Avenue to Carlaw Avenue between Gerrard and Queen Streets. This would shift the planned — yet unfunded — subway line two blocks west. The Pape alignment was chosen for ease of construction and operation (the line must curve from north to west just south of Queen Street), and is only two blocks away. That study will cost $520,000 and staff time.

    All these new studies are illustrated below. For clarity’s sake, the Sheppard East LRT, the Scarborough LRT proposal, and the existing Scarborough RT (Line 3) are removed. You can read more about how the votes went down on Steve Munro’s site.

    Transit Plan July 2016The map of planned, approved and existing rapid transit lines, and those extensions and re-alignments approved for study

    The “subways, subways, subways” sentiment is alive and well at City Hall, even if Rob Ford has passed on. And despite the thirst for expensive new subway lines,  Mayor Tory is still backing an austerity agenda at City Hall. Apart from the decorum, not much has changed in the mayor’s office.

  • The difference between the Fords’ Subway Plan and John Tory’s Subway Plan

    201493-rob-ford-subway
    The Rob Ford/Doug Ford Subway Plan, circa 2014

    The above is the subway plan promoted by Rob Ford, and later Doug Ford, in the 2014 municipal election. Thanks to today’s pandering to suburban councillors demanding their own subway lines, below is the John Tory-backed subway plan.

    tory-subway
    The John Tory Subway Plan, circa 2016

  • The Truth About SmartTrack

    smarttrack_fb

    This article originally appeared on June 27, 2016 in Torontoist

    In 2014, then-mayoral candidate John Tory ran on a campaign of sound fiscal management, returning decorum to City Hall, and a curious new transit plan called SmartTrack, which promised “London-style” rapid transit from Mississauga to Markham. During the election campaign Tory claimed that the new rail service—53 kilometres long, costing $8 billion—would provide needed transit relief in just seven years, all on a TTC fare.

    During campaign speeches, Tory called the plan “bold.” He also promised to build the Rob Ford-backed subway extension to Scarborough Centre, rather than return to the cheaper, funded light rail alternative that candidates Olivia Chow and David Soknacki were backing.

    Of course, Tory won the election, and many Torontonians were looking forward to an era of competent governance, if not visionary leadership. But two years in, the costs of the Scarborough subway keep mounting, even if the number of stations kept shrinking (from three stations to one stop), and the scope of John Tory’s “bold” SmartTrack plan kept getting watered down.

    With the recent provincial and municipal transit announcements on new GO Station locations, it’s now official: SmartTrack is nothing more than a brand name for transit projects that were already in the works. And the City of Toronto is stuck with some of the construction costs that would have been borne by the province.

    Mayor Tory and the provincial government held two separate transit announcements this week: one in Liberty Village, the other at the former Unilever lands that First Gulf is looking to redevelop as a major office and commercial centre. While Tory has been bullish about promoting First Gulf’s development, the East Gardiner replacement, SmartTrack Station, and even a Relief Line subway stop—projects he championed—will all serve this particular property.

    Those announcements coincide with a Metrolinx report [PDF] that recommends 12 new GO Transit stations: Breslau, St. Clair, and Liberty Village on the Kitchener Line; Innisfil, Mulock, Kirby, Davenport-Bloor, and Spadina on the Barrie Line; East Harbour (Unilever), Gerrard, Lawrence East, and Finch East on the Lakeshore East and Stouffville lines. Stations at Mount Dennis, Downsview Park, and Caledonia were already approved and will connect to the subway and Crosstown LRT. Seven of those stations—from Mount Dennis to Unionville—are along the SmartTrack corridor. Spadina Station, part of Tory’s SmartTrack map, will only be served by Barrie corridor trains.

    From the start, SmartTrack was a fantasy built on assumptions; the line was an idea conceived by a little-known organization called Strategic Regional Research Alliance. SRRA authored a report, “The Business Case for the Regional Rail Line,” discussing the potential of a 2009 concept for connecting suburban office parks with Downtown Toronto with rapid transit. That report became the basis for SmartTrack.

    Meanwhile, Metrolinx—the provincial transportation authority for the Greater Toronto and Hamilton Area—was involved in studying plans for converting much of its existing GO Transit rail network from a commuter rail system to an electrified, regional rail network known as Regional Express Rail. RER and SmartTrack (as well as VIA Rail and UP Express trains) would be sharing the same corridors.

    Since the election, the truth about SmartTrack has become clear. Previous plans for SmartTrack were simplistic, with maps created using out-of-date Google Maps imagery that ignored the fact that lands owned by the City of Toronto along Eglinton Avenue in Etobicoke—reserved for an unbuilt freeway—were largely sold off and redeveloped. There were serious engineering and financial complications of building the connection between the existing GO line at Mount Dennis and the Eglinton spur. The plan to use tax increment financing (TIFs) to build SmartTrack remains dubious. The Eglinton spur was removed, replaced by the revival of the approved yet unfunded western section of the Eglinton Crosstown LRT. Tory surrounded himself with experts, including a prominent University of Toronto transportation professor who gave the plan an “A+.” Critics who pointed out these flaws were ignored or insulted. There are few excuses that Tory can make for this failure.

    With the latest announcements, it is clear that SmartTrack has become nothing more than a moniker for an existing GO Transit RER. Rush-hour train frequencies will likely be every eight to 10 minutes; off peak, trains will arrive every 15 minutes (the TTC subway never operates at less than six-minute frequencies). We do not know what fares will be charged on GO RER/SmartTrack as Metrolinx continues to study regional fare integration. And it is very unlikely that we will be seeing frequent, electric trains offering relief by 2021.

    As the Globe and Mail‘s Marcus Gee points out, the City will now be expected to pick up much of the construction tab—similar to how the municipal government is stuck with cost overruns on the Scarborough subway extension after it rejected a provincially funded seven-stop light rail line to replace the ageing RT line.

    At best, SmartTrack represents the City of Toronto’s buy-in to GO RER, a worthwhile project to provide better rail service to suburban Toronto and the 905. There’s room to negotiate at least some fare integration between GO and the TTC. But at worst, SmartTrack is a failure to deliver on a key election promise, as flawed as it is. But in order for the Mayor to save face, the SmartTrack brand will likely never go away.